Kunshan Fengyongsheng Automation Equipment Co., LTD
Contact person: Mr. Ye
Contact number: 13862602473
Contact number: 13826962383
Address: No. 1768, Hua 'an Road, Huaqiao Town, Kunshan City, Jiangsu Province
Rivet machine manufacturer teaches you to disassemble and install rivet machine!
The newly purchased rivet machine must be dismantled and cleaned before use to remove the anti-rust oil layer and dirt. The rivet machine that has been used for a long time should also be regularly disassembled, cleaned and repaired. The sequence of disassembly and device is as follows:
1. Rivet machine disassembly
(1) Hold one end of the opening of the fixing ring with a screwdriver, press the other end face with your hand, and gently push the screwdriver to open the fixing ring and disconnect from the handle body.
(2) Push the stop ring to separate the serrated teeth from the teeth of the handle body.
(3) Screw off the handle body with a wrench.
(4) Remove the valve cabinet, valve, lower valve cabinet and cylinder pin from the cylinder block.
(5) Remove handle parts.
2. Riveting machine device
The order of the device is opposite to that of disassembly. Precautions for the device are as follows:
(1) After the handle body component device is connected with the gas supply hose, press the pressure handle to investigate the opening and closing of the gas path, and the gas path should be closed when the pressure handle is loosened; There shouldn't be any air leakage right now.
(2) when the handle body is screwed to the cylinder, it should be tightened and not loosened. The serrated teeth of the stop ring and the serrated teeth of the handle body should be positive. If the azimuth difference between the two teeth is large, the stop ring should be withdrawn, and one or several spline teeth should be rotated, and then pushed up.
(3) When fixing the ring, hold the stop ring with your hand, clamp the fixing ring into the ring groove of the handle body from the side, and then push it smoothly with force to secure it.
(4) Disassembly and installation shall be carried out in clean and boring special places (tool room, maintenance station), and shall not be disassembled and installed on the work site.
(5) After the completion of the device, the machine will be inverted, if the valve is in the rear position, when the hammer is put into the cylinder, the hammer should be free to fall into the valve cabinet, and can hear the sound of the valve. Add a small amount of lubricating oil to the cylinder, install the gas hose, and start the test run.
Kunshan Fengyongsheng Automation Equipment Co., LTD
Contact person: Mr. Ye
Contact number: 13862602473
Contact number: 13826962383
Address: No. 1768, Hua 'an Road, Huaqiao Town, Kunshan City, Jiangsu Province